Raportul RATT an 2009, in atasament, preluat de aici: http://www.primariatm.ro

Obiective de investitii importante, 2010 - 2011:

1.Reabilitarea liniilor de tramvai si modernizarea tramelor stradale in Municipiul Timisoara, alocatii bugetare, durata estimata de realizare - 2010, 2011, 2012
2.Dublare linie de troleibuz pe bv. Parvan, alocatii bugetare, durata estimata de realizare - 2010
3.Linie de troleibuz pe str. Lidia, alocatii bugetare, durata estimata de realizare - 2010, 2011.


Attachments:
Raport_RATT_2009.pdf [104.94 KiB]
Downloaded 364 times
Top
 Profile  
 
 Post subject:
PostPosted: Fri 05 Mar 2010 23:50 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
In atasament Planul de actiune pt. Polul de crestere Timisoara. Preluat de aici: http://www.primariatm.ro

Proiecte pt. transport (spicuiri):

-extinderea liniei de tramvai Timisoara - Albina (Mosnita Noua)
-extinderea liniei de tramvai Timisoara - Sinmihaiu Roman
-extinderea liniei de tramvai Timisoara - Sag
-extinderea retelei de troleibuze Timisoara - Dumbravita
-extinderea retelei de troleibuze Timisoara - Ghiroda
-extinderea retelei de troleibuze Timisoara - Sacalaz


Attachments:
Plan actiune Timisoara.pdf [578.85 KiB]
Downloaded 478 times
Top
 Profile  
 
 Post subject:
PostPosted: Fri 26 Mar 2010 08:47 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Grafic de implementare PIDU.

http://www.primariatm.ro/uploads/files/ ... 3_2010.pdf


Attachments:
04_Anexa04_Grafic_implementare_12_03_2010.pdf [217.83 KiB]
Downloaded 407 times
Top
 Profile  
 
 Post subject:
PostPosted: Sun 11 Apr 2010 19:30 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Extinderea transportului cu troleibuze in Dumbravita (3,6 km cale dubla) si Ghiroda (3,9 km cale dubla) reprezinta proiecte prioritare pt. finantare prin POR, Axa 1.


Attachments:
Anexa11_Proiecte_prioritare_si_proiecte_Axa1.pdf [590.03 KiB]
Downloaded 826 times
Top
 Profile  
 
 Post subject:
PostPosted: Fri 17 Dec 2010 11:25 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Silviu Sintea wrote:
Extinderea transportului cu troleibuze in Dumbravita (3,6 km cale dubla) si Ghiroda (3,9 km cale dubla) reprezinta proiecte prioritare pt. finantare prin POR, Axa 1.


Se fac pasi concreti in acest sens:
http://www.e-achizitii.com/view_anunt.p ... unt=364314
http://www.e-achizitii.com/view_anunt.p ... unt=364315


Attachments:
Fisa date Ghiroda.doc [246 KiB]
Downloaded 345 times
Fisa date Dumbravita.doc [234.5 KiB]
Downloaded 332 times
Tema proiectare - Troleibuz Ghiroda.pdf [683.65 KiB]
Downloaded 408 times
Tema proiectare - Troleibuz Dumbravita.pdf [683.96 KiB]
Downloaded 375 times
Top
 Profile  
 
PostPosted: Fri 15 Apr 2011 12:50 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Este vorba despre o noua licitatie:

Nr. anunt SEAP/Data publicare: 287735/06.04.2011
Denumire contract: Contract de prestari servicii de proiectare a documentatiei tehnico-economice si elaborare a cererii de finantare pentru obiectivul de investitie: ,,Extindere retea troleibuz Dumbravita", in conformitate cu cerintele impuse prin Tema de proiectare
Valoare estimata: 243.000 RON

Nr. anunt SEAP/Data publicare: 287734/06.04.2011
Denumire contract: Contract de prestari servicii de proiectare a documentatiei tehnico-economice si elaborare a cererii de finantare pentru obiectivul de investitie: ,,Extindere retea troleibuz Ghiroda", in conformitate cu cerintele impuse prin Tema de proiectare
Valoare estimata: 264.000 RON


Attachments:
Tema_proiectare_Dumbravita.pdf [429.32 KiB]
Downloaded 326 times
Tema_proiectare_Ghiroda.pdf [428.54 KiB]
Downloaded 349 times
Fisa date - serv proiectare pt Extindere retea troleibuz Dumbravita.doc [259.5 KiB]
Downloaded 312 times
Fisa date - serv proiectare pt Extindere retea troleibuz Ghiroda.doc [254.5 KiB]
Downloaded 322 times
Top
 Profile  
 
 Post subject:
PostPosted: Sat 16 Apr 2011 00:52 
Offline

Joined: Mon 01 Oct 2007 17:54
Posts: 3297
Quote:
Extindere retea troleibuz

Azi in Timisoara, maine-n toata tara!

A fost o gluma... Tara nu prea mai exista.


Top
 Profile  
 
 Post subject:
PostPosted: Mon 22 Aug 2011 19:14 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Nu vor să le treacă tramvaiul prin fața casei! Păreri împărțite la Moșnița Nouă despre extinderea liniei 4

Mai mulți locuitori din comuna timișeană Moșnița Nouă se opun proiectului Primăriei Timișoara de extindere a liniei de tramvai.

Mie nu-mi convine să nu mai am liniște și să-mi treacă tramvaiul prin fața geamului de la stradă. Bine că n-avem apă, canalizare, gaz și ei se preocupă de tramvai. De ce au scos autobuzele?, ne-a declarat supărat un locatar de pe strada Principală. Au zis că nu mi se dărâmă casa, dar eu nu sunt așa convinsă. Și așa cum e, de văiugă, e singura avere a familiei mele pentru care lucrează deja a treia generație. Și nu îmi convine să facă linia de tramvai în mijlocul comunei și să înghit praf 20 de ani până când o să fie gata. Că nu am încredere că e gata repede, ne-a spus o altă locatară.

În schimb, primarul comunei Moșnița Nouă, Ioan Sorincău, spune că au fost organizate dezbateri publice în localitate și majoritatea oamenilor sunt încântați. Sunt câțiva care locuiesc pe strada Principală și nu sunt de acord. Au spus că le va trece tramvaiul prin fața casei, dar nu este adevărat, va trece la 12 metri de casă. Și eu locuiesc pe strada Principală și nu e nicio problemă, ne-a spus edilul.

Primăria Timișoara are de gând, cu bani europeni, să extindă rețeaua de tramvaie până în comuna Moșnița Nouă. Liniile ar urma astfel să lege localitatea direct de zona centrală a Timișoarei.

Dezbaterea publică a inițiativei va avea loc marți, 23 august, începând cu ora 15, la Sala de Sport a comunei Moşnita Nouă (aflată pe drumul spre Urseni), iar locatarii își pot spune părerea.

Proiectul este prevăzut cu sistem elastic al șinei care reduce vibrațiile și zgomotul, iar tramvaiele care vor circula vor fi moderne, silențioase, din acelea pe care urmează să le achiziționăm.

Problema acolo este a traficului care produce zgomot și ar trebui să ia măsuri să interzică circulația tirurilor, a declarat pentru www.oradetimis.ro, Culiță Chiș, șeful Direcției Drumuri și Transporturi din Primăria Timișoara.


http://www.oradetimis.ro/nu-vor-sa-le-t ... 011/08/22/


Attachments:
tramvaiul 4.jpg
tramvaiul 4.jpg [ 22.38 KiB | Viewed 17024 times ]
Top
 Profile  
 
 Post subject:
PostPosted: Fri 04 Nov 2011 10:56 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Silviu Sintea wrote:
Nr. anunt SEAP/Data publicare: 287735/06.04.2011
Denumire contract: Contract de prestari servicii de proiectare a documentatiei tehnico-economice si elaborare a cererii de finantare pentru obiectivul de investitie: ,,Extindere retea troleibuz Dumbravita", in conformitate cu cerintele impuse prin Tema de proiectare
Valoare estimata: 243.000 RON

Nr. anunt SEAP/Data publicare: 287734/06.04.2011
Denumire contract: Contract de prestari servicii de proiectare a documentatiei tehnico-economice si elaborare a cererii de finantare pentru obiectivul de investitie: ,,Extindere retea troleibuz Ghiroda", in conformitate cu cerintele impuse prin Tema de proiectare
Valoare estimata: 264.000 RON


Castigator: INCERTRANS SA Bucuresti.
Sursa documente: http://www.primariatm.ro


Attachments:
atr_documentatie_troleu_dumbravita.pdf [62.56 KiB]
Downloaded 399 times
atr_ext_ghiroda.pdf [62.96 KiB]
Downloaded 417 times
Top
 Profile  
 
 Post subject:
PostPosted: Fri 16 Dec 2011 11:09 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Quote:
Reabilitare linii tramvai si modernizare trame stradale pe Str. Stefan cel Mare din Municipiul Timisoara


Attachments:
tram.pdf [6.01 KiB]
Downloaded 337 times
Referat tram.pdf [120.94 KiB]
Downloaded 376 times
Anexa tram.pdf [114.03 KiB]
Downloaded 308 times
Top
 Profile  
 
 Post subject:
PostPosted: Thu 19 Jan 2012 21:48 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Hotararea Consiliului Local 425/13.12.2011
troleibuz Ghiroda.
http://www.primariatm.ro/hcl.php?unid=0 ... 6500307DF0


Attachments:
425.pdf [5.79 KiB]
Downloaded 270 times
anexe_+_referat_hcl_425.pdf [428.28 KiB]
Downloaded 316 times
Top
 Profile  
 
 Post subject:
PostPosted: Thu 19 Jan 2012 21:52 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Hotararea Consiliului Local 392/13.12.2011
troleibuz Dumbravita.
http://www.primariatm.ro/hcl.php?unid=3 ... 5700453C87


Attachments:
392.pdf [5.69 KiB]
Downloaded 285 times
Anexa Dv.pdf [126.92 KiB]
Downloaded 271 times
Referat Dv.pdf [170.59 KiB]
Downloaded 272 times
Anexa_Acord_Dumbravita_consolidat.pdf [174.9 KiB]
Downloaded 258 times
Top
 Profile  
 
 Post subject:
PostPosted: Fri 17 Feb 2012 12:19 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Ce prevede noul PUG.

- Extinderea transportului electric cu tramvaiul in zona periurbana (Mosnita Noua - Mosnita Veche respectiv Sag)

- Extinderea infrastructurii de transport electric urban cu troleibuze prin:

- interconectarea infrastructurii existente pe radialele magistrale (Cluj-Michelangelo, Mihai Viteazul, Republicii, Gh. Lazar, Torontalului/Aradului/Sever Bocu prin Al.I.Cuza, Take Ionescu) prin echiparea inelului I de circulatie cu infrastructura de transport public electric cu troleibuze;

- prelungirea infrastructurii existente pe Cl. Aradului pana la limita orasului (giratia SELGROS);

- prelungirea infrastructurii existente de pe Cl. Torontalului pana la P.I.T.T.;

- prelungirea infrastructurii existente de pe Gh. Lazar pe str. O. Balea pana la pasaj C.F.;

- tronsoane noi pe Baba Dochia - Iepurelui - Pestalozzi - Corneliu Coposu respectiv pe N. Andreescu (pana la P-ta. Petofi);

- tronsoane noi pe bd. Maresal Constantin Prezan si str. Venus;

- tronsoane noi pe bd. Sudului (prelungire catre Sud si catre Nord pe traseu nou pana la str. Prof. Dr. Aurel Paunescu Podeanu);

- tronsoane noi pe str. Prof. Dr. Aurel Paunescu, Podeanu si aleea Ripensia.

- Extinderea transportului electric cu troleibuze in zona periurbana (Dumbravita, Ghiroda, Giroc).


http://www.primariatm.ro/uploads/files/ ... erplan.pdf


Attachments:
masterplan.pdf [13.21 MiB]
Downloaded 339 times
Top
 Profile  
 
 Post subject:
PostPosted: Sat 24 Mar 2012 20:26 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Hotararea Consiliului Local 87/28.02.2012
Hotarare privind aprobarea proiectului complex de investitii "Extindere retea troleibuz Dumbravita"

http://www.primariatm.ro/hcl.php?unid=9 ... AC004AB5E8


Attachments:
87-2012.pdf [6.25 KiB]
Downloaded 289 times
Anexa1.pdf [127.26 KiB]
Downloaded 273 times
Anexa_Acord1.pdf [184.4 KiB]
Downloaded 258 times
Referat1.pdf [171.53 KiB]
Downloaded 306 times
Top
 Profile  
 
 Post subject:
PostPosted: Sat 24 Mar 2012 20:29 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Hotararea Consiliului Local 86/28.02.2012
Hotarare privind aprobarea proiectului complex de investitii "Extindere retea troleibuz Ghiroda"

http://www.primariatm.ro/hcl.php?unid=C ... AC00488E74


Attachments:
86-2012.pdf [6.15 KiB]
Downloaded 317 times
Anexa.pdf [127.78 KiB]
Downloaded 246 times
Anexa_Acord.pdf [172.71 KiB]
Downloaded 260 times
Referat.pdf [174.46 KiB]
Downloaded 313 times
Top
 Profile  
 
 Post subject:
PostPosted: Fri 27 Apr 2012 12:41 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Extindere linie cale de tramvai Timisoara - comuna Mosnita Noua, Programul Operational Regional POR 2007-2013, axa 1.

Documente relevante ale proiectului se gasesc in atasament, fiind preluate de aici: http://arpmtm.anpm.ro/formulare_pentru_ ... 2010-55974


Attachments:
59723_Raport EIM_Mosnita Noua_29.02.2012.pdf [4.29 MiB]
Downloaded 683 times
59726_Anexa B - Plan de incadrare in zona.pdf [1.08 MiB]
Downloaded 224 times
59727_Anexa C - Planuri de situatie.rar [12.65 MiB]
Downloaded 609 times
59731_Anexa D - Profiluri transversale.rar [1.37 MiB]
Downloaded 594 times
59732_Anexa E - Tabel valori trafic.pdf [111.25 KiB]
Downloaded 216 times
59733_Anexa F - Situatie suprafete afectate.rar [766.61 KiB]
Downloaded 597 times
59735_Anexa G - Imagini foto.pdf [2.6 MiB]
Downloaded 266 times
prezentarea solutiilor de rezolvare a problemelor semnalate de publicul interesat.rar [182.25 KiB]
Downloaded 589 times
Top
 Profile  
 
 Post subject:
PostPosted: Fri 27 Apr 2012 13:02 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Proiectele privind extinderea retelei de troleibuz in Ghiroda, respectiv Dumbravita nu se supun evaluarii impactului asupra mediului si nu se supun evaluarii adecvate.

http://arpmtm.anpm.ro


Attachments:
ProiectDecizieIncadrarenr.93din15.03.2012-PMTExtinderereteatroleibusGhiroda.doc [216.5 KiB]
Downloaded 241 times
ProiectDecizieIncadrarenr.94din15.03.2012-PMTExtinderereteatroleibusDumbravita.doc [216.5 KiB]
Downloaded 234 times
Top
 Profile  
 
 Post subject:
PostPosted: Fri 27 Apr 2012 13:10 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Extindere linie cale de tramvai Timisoara - comuna Mosnita Noua, Programul Operational Regional POR 2007-2013, axa 1.

Primarul comunei doreste ca legatura Timisoara - Mosnita Noua sa se realizeze cu troleibuze, nu cu tramvaie.

http://www.mosnitanoua.ro/userfiles/fil ... 9_2011.pdf


Attachments:
PV%2028_09_2011.pdf [80.13 KiB]
Downloaded 217 times
Top
 Profile  
 
 Post subject:
PostPosted: Tue 18 Sep 2012 17:07 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Quote:
Hotarare privind aprobarea proiectului complex de investitii "Extindere retea troleibuz Ghiroda"

http://www.primariatm.ro


Attachments:
Referat.pdf [174.73 KiB]
Downloaded 248 times
Anexa.pdf [172.27 KiB]
Downloaded 245 times
Anexa_HCL.pdf [126.45 KiB]
Downloaded 219 times
Top
 Profile  
 
 Post subject:
PostPosted: Tue 18 Sep 2012 17:09 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Quote:
Hotarare privind aprobarea proiectului complex de investitii "Extindere retea troleibuz Dumbravita"

http://www.primariatm.ro


Attachments:
Referat2.pdf [171.27 KiB]
Downloaded 269 times
Anexa_2.pdf [183.11 KiB]
Downloaded 204 times
Anexa2a.pdf [126.14 KiB]
Downloaded 243 times
Top
 Profile  
 
 Post subject:
PostPosted: Wed 30 Jan 2013 07:12 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Timișoara primește finanțare europeană în valoare de 84 de milioane de lei pentru realizarea a trei proiecte

“Mâine semnez la București trei contracte pe trei proiecte de finanțare. E vorba de reabilitarea liniilor de tramvai și modernizare came stradale pe strada Ștefan cel Mare în valoare de valoare 24 milioane de lei, management trafic și montare de camere video în valoare 43 milioane lei și al treilea, extindere rețea troleibuz Dumbrăvița în valoare de 17 milioane lei”, a declarat primarul Nicolae Robu.

După semnarea contractelor de finanțare pot fi demarate licitațiile pentru execuția lucrărilor.
Sistemul de management și supraveghere a traficului din Timișoara presupune montarea de camere video în cele 90 de intersecții semaforizate. În alte 44 de intersecții se vor instala sisteme luminoase de trafic și de supraveghere video. În pus, tot orașul va avea un sistem de control trafic. Vor fi montate 37 de aparate care detectează trecerea pe culoarea roșie a semaforului, șapte radare fixe și alte 13 radare de informare, care îi vor anunța pe șoferi dacă au depășit viteza legală de circulație. Termenul de finalizare este de nouă luni.

Prin proiectul de extindere a rețelei troleibuz Dumbrăvița, linia troleibuzului 14 ar urma să se extindă pe o lungime de 3700 de metri, ceea ce înseamnă și amenajarea a 12 stații. Termenul de execuție este de 6 luni. Contribuția primăriei Timișoara este de aproape 9 milioane de lei, iar cea a comunei Dumbrăvița, de aproape 245.000 de lei.

Proiectul de reabilitare a liniilor de tramvai și modernizare a tramelor stradale pe strada Ștefan cel Mare din Timișoara presupune lucrări pe o lungime de 0,860 km stradali, de la str. St. O. Iosif până la intersecția cu str. 1 Decembrie. Termenul de execuție a lucrărilor este de nouă luni.


http://www.tmpress.ro/2013/01/28/primar ... t-acestea/


Top
 Profile  
 
 Post subject:
PostPosted: Thu 28 Feb 2013 16:31 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Intre timp si proiectul privind extinderea retelei de troleibuz la Ghiroda face pasi fermi prin hatisul birocratic.

www.sgg.ro


Attachments:
Ghiroda.pdf [183.22 KiB]
Downloaded 200 times
Top
 Profile  
 
PostPosted: Fri 31 Jan 2014 17:39 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
S-a stabilit: Linia de tramvai între Timişoara şi Moşniţa Nouă nu se mai face

Primarul Timişoarei, Nicolae Robu, şi primarul comunei Moşniţa Nouă, Ioan Sorincău, s-au întâlnit pentru a discuta despre proiectul liniei de tramvai dintre cele două localităţi.

Întrevederea vine după un episod mai tensionat, în care Sorincău se declara dezamăgit de Robu. Edilul timişorean declarase că proiectul, care aparţine fostei administraţii, nu poate fi o prioritate pentru acest an.

Troleibuz spre Moşniţa Nouă?

În urma discuţiilor de luni seara, cei doi primari au convenit să abandoneze proiectul liniei de tramvai. În schimb, Robu susţine că se vor căuta alternative mai uşor de pus în practică.

„Domnul Sorincău este un om cu experienţă în administraţie. A înţeles foarte bine punctul meu de vedere. L-am asigurat de tot interesul meu de a realiza o cât mai bună conectivitate între Timişoara şi Moşniţa Nouă. Am discutat mai multe variante concrete cu dânsul şi ne vom mai întâlni şi pentru alte colaborări. Linia de tramvai nu se mai face. A căzut această variantă, în lipsa unor fonduri europene care să susţină şi realizarea liniei şi cumpărarea de tramvaie. Nu se justifică să alocăm bani de la bugetul local la volumul respectiv pentru un asemenea obectiv. Conectarea comunei Moşniţa poate fi îmbunătăţită şi altfel. Există autobuze şi la ora actuală, sunt şi alte variante pe care le vom pune în practică”, a declarat Robu.

Soluţiile despre care s-a vorbit se referă la amenajarea unor drumuri, rute mai scurte între localităţi, şi chiar prelungirea unei linii de troleibuz până la Moşniţa. De asemeena, drumul judeţean se va lărgi la patru benzi. Mai mult, Robu vorbeşte şi de varianta achiziţionării unor autobuze electrice în următorii ani, care să suplinească lipsa tramvaiului.

Proiectul extinderii liniei de tramvai până la Moşniţa datează din vara anului 2011. Investiţia ar fi fost de aproximativ 60 de milioane de euro, ar fi cuprins linie de tramvai nouă până în comună, tramvaie noi şi chiar depou în afara oraşului. De teama vibraţiilor produse de tramvai, unii locuitori ai comunei Moşniţa Nouă se opuneau proiectului.


http://ziuadevest.ro/actualitate/44619- ... -face.html


Attachments:
tramvaie RATT.jpeg
tramvaie RATT.jpeg [ 22.55 KiB | Viewed 12018 times ]
Top
 Profile  
 
PostPosted: Fri 30 Jan 2015 17:47 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
Proiecte...

SF + PT Extindere rețea troleibuz Timișoara - Giroc

SF + PT Modernizare rețea de contact troleibuz

SF + PT Linie de tramvai între Spitalul de Copii - Gara de Nord și Solventul, racordare Inel IV

SF + PT Extindere linie cale tramvai Timișoara - Sânmihaiu Român

Reabilitare tramvaie

Achiziție autobuze de capacitate mică (15 buc.)

Achizitie tramvaie noi (50 buc.)

Achizitie troleibuze noi (50 buc.)

Achiziție autobuze electrice cu podea joasă (55 buc.)

Modernizare substații de transformare-redresare (3 buc.-substațiile 2,6,7)


Attachments:
totportofoliul_lista-investitii.pdf [324.95 KiB]
Downloaded 279 times
Top
 Profile  
 
PostPosted: Fri 22 Jan 2016 15:48 
Offline
User avatar

Joined: Tue 18 Oct 2005 08:49
Posts: 56065
P.M.U.D.

S4 • Construcția unei rețele de troleibuz pe relația bd. I. C. Brătianu - str. Hector / str. Martin Luther - str. Popa Șapcă - bd. Antenei • Lungime totală 1,6 km cale bidirecțională, nu include stație de redresare. • Va prelua călătorii pe relațiile Lipovei – Iulius Mall – Centru – str. Cluj – Braytim • Include elementele de rețea, cablurile de echilibrare a sarcinilor și sisteme moderne de prindere, cu suspensie.

S5 • Construcția unei rețele de troleibuz pe radiala înspre Giroc, între str. Mareșal Constantin Prezan și centrul comunei Giroc. • Lungime totală 4,3 km cale bidirecțională, necesită stație de redresare. • Va prelua călătorii pe relația Giroc – Timișoara • Acest proiect poate fi implementat doar în contextul denivelării intersecției cu calea ferată (ulterior sau simultan cu implementarea proiectului C34).

S6 • Construcția unei rețele de troleibuz pe relația str. Gr. Alexandrescu - str. Moise Doboșan - str. Tazlău - str. Locotenent Ovidiu Balea • Lungime totală 3,2 km cale unidirecțională, include stație de redresare. • Va prelua călătorii pe relațiile Mehala – centru. • Include elementele de rețea, cablurile de echilibrare a sarcinilor și sisteme moderne de prindere, cu suspensie • Va fi studiată și varianta extensiei bidirecționale exclusiv pe radială, în special în contextul unei posibile viitoare extensii înspre Săcălaz (în cazul materializării dezvoltărilor imobiliare prevăzute).

C11• Construcția unei rețele de troleibuz (cale bidirecțională) între Piața Iuliu Maniu și pasajul CF de pe Calea Șagului. • Având în vedere faptul că pe această arteră operează ruta de autobuz cu cea mai ridicată frecvență, primăria va analiza posibilitatea realizării rețelei de contact pentru troleibuz pe actuala infrastructură stradală cu minime adaptări.


-> 2020

• Achiziția a 15 tramvaie lungi (1,5 MEUR/bucată), 10 de troleibuze articulate (0,45 MEUR/bucată), 5 troleibuze nearticulate (0,33 MEUR/bucată) și 10 autobuze nearticulate (dintre care 8 de tip urban și 2 de tip lung parcurs, pentru rutele metropolitane pe distanțe mai mari) (0,22 MEUR/bucată).

2021 - 2030

• Achiziția a 10 tramvaie lungi (1,5 MEUR/bucată), 20 tramvaie scurte (1,2 MEUR/bucată), 20 de troleibuze articulate (0,45 MEUR/bucată), 20 troleibuze nearticulate (0,33 MEUR/bucată), 20 autobuze articulate (0,28 MEUR/bucată) și 20 de autobuze nearticulate (dintre care 15 de tip urban și 5 de tip lung parcurs, pentru rutele metropolitane pe distanțe mai mari) (0,22 MEUR/bucată).


Attachments:
Timisoara SUMP var IV.pdf [19.22 MiB]
Downloaded 160 times
Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 25 posts ] 

All times are UTC + 3 hours


Who is online

Users browsing this forum: No registered users and 2 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
cron
Powered by phpBB® Forum Software © phpBB Group